Skip to main content
NP-IN/Start a project

Tell us what you need to achieve with AI

You do not need a vendor list, a hall name, or a finished BOM. NeuronPlant takes the requirement from there: facility fit, architecture, purchase of the required equipment, coordination, deployment, validation, and handover. If you already have a room, we validate it. If you do not, we find or coordinate one. We do not pour a campus to make a no into a yes. Day-1 is either a minimum cell or a future-ready foundation. Unlimited scale is not an option.

NP-ENG / Engagement

What you buy after this form

The same eight steps as the homepage. Facility fit and architecture before procurement. NeuronPlant can purchase the required equipment against that architecture. Constraints, options, and the investment path stay visible at every gate.

  1. 01 / Requirement

    Workload, scale, accelerator needs, availability and growth. What you need to achieve with AI, not a shopping list.

  2. 02 / Facility Fit

    Validate the existing hall, or identify a room that can take the power, cooling, rack, network and operational load. The hall operator still supplies and operates that room.

  3. 03 / Architecture

    Compute, fabrics, storage, structured cabling, power, cooling and platform as one engineered architecture. Design authority. Not the end of the job.

  4. 04 / Procurement

    NeuronPlant can purchase the equipment required for the project, against that architecture. Not a box reseller taking a customer shopping list.

  5. 05 / Coordination

    Engage and coordinate the hall, OEMs, integrators, contractors and specialists. The customer does not manage that roster.

  6. 06 / Deployment

    Install and integrate the plant in the hall. NeuronPlant manages the delivery dependencies.

  7. 07 / Validation

    Prove the factory: performance, network, structured cabling, storage, cooling, and failover.

  8. 08 / Handover

    Documentation, training, operate / monitor, and a working AI factory. One project. One point of responsibility.

NP-INT / How we bid

Constraints first. Options in writing. The money path visible. The constraints we show belong to the hall we occupy. If the room cannot take the load, we write that down, or we match a hall partner or custom-system supplier. We will not write a tender that is already aimed at one vendor. Integrity before margin on a steered BOM.

Minimum Day-1 buys what runs now. Future-ready Day-1 spends more on trunks, pathways, PDU reserve, and cooling the next cell can join. CapEx versus disruption. The customer sees both.

Expansion / Day-1

projects@neuronplant.com

NP-PLT / Client portal

After intake, the delivery runs as one customer record: status, architecture, facility and hall, suppliers, procurement, milestones, documentation, and handover. The client portal is the preview of that project environment. It is specified, not live. It is not the product, and it is not a hall marketplace.

Client portal preview
Loading intake…