A Steered RFP Is Not a Plant Spec
A factory tender already aimed at one vendor is a capture. Write the constraints first. Leave the SKU until the plant can take it.
An RFP that already names the winner is not a specification. It is a capture dressed as process.
The first constraint is the plant: site, power, cooling, compute, network, structured cabling, storage, platform, operate. If those are not written, the SKU list is a shopping cart.
Advisors get paid. Some get paid more when a particular BOM ships. That is not a secret. What fails is hiding that money path from the customer.
NeuronPlant's position is simple. The customer sees the same constraints, options, and money path we see. We do not steer a plant toward the SKU that pays the advisor.
Integrity before margin on a steered BOM. If the two conflict, we lose the margin. We do not lose the spec.
No games. No tricks. Transparency is the commercial method, not a footnote.